Hi all, and good day ....
Been reading the forum for years, and cant thank you all enough for the valuable information that everyone shares here !!
My question is
I have a commercial modular metering tap question (GE mini mod ll) circa 1980s
We need to add a 4 high stack to an existing installation
The existing is in a small electrical room, with a main service circuit breaker disconnect bottom fed from an underground utility conduit, and in turn feeds out overhead via pipe and wire to the tap box on a opposite wall, and the meter stacks with tenant mains extend both left and right of the center tap box
Because of space and compatibility constraints we cannot simply bolt up another stack to the existing
We will still locate that in the electrical room but a little away from the meter packs are now
My question is - if we extend the tap from the existing tap box - will we need overcurrent protection at the new stack location
Or will we need to tap from the main breaker and still possibly need OCP at the new stack ?
Thanks
Bob
Been reading the forum for years, and cant thank you all enough for the valuable information that everyone shares here !!
My question is
I have a commercial modular metering tap question (GE mini mod ll) circa 1980s
We need to add a 4 high stack to an existing installation
The existing is in a small electrical room, with a main service circuit breaker disconnect bottom fed from an underground utility conduit, and in turn feeds out overhead via pipe and wire to the tap box on a opposite wall, and the meter stacks with tenant mains extend both left and right of the center tap box
Because of space and compatibility constraints we cannot simply bolt up another stack to the existing
We will still locate that in the electrical room but a little away from the meter packs are now
My question is - if we extend the tap from the existing tap box - will we need overcurrent protection at the new stack location
Or will we need to tap from the main breaker and still possibly need OCP at the new stack ?
Thanks
Bob