SmithBuilt
Senior Member
- Location
- Foothills of NC
What code cycle was it legal to tap the service conductors between the meter and service disco? Or was it ever?
Say for adding an air condition or such. I've run across several lately that had a small subpanel added next to the meter. Then wired to the load side of the meter lugs along with the sec's to the main panel.
Say for adding an air condition or such. I've run across several lately that had a small subpanel added next to the meter. Then wired to the load side of the meter lugs along with the sec's to the main panel.