My goal is to feed a transformer primary disconnect. To get the power for it I must tap on the load side of a 3000A service fuse. The length of the tap is between 10-25 feet so I would need 1000A minimum wires...
I am thinking of running 3 sets of 4#400KCMIL copper to get the 1000A minimum however I probably cannot do that due to the arrangement of the busses being parallel per phase. Would 300.3(B)(1) be violated if I do 3 sets of 4#400KCMIL by tapping the left bus with 2 sets and tapping right bus with 1 set per phase?
See photo below:

I am thinking of running 3 sets of 4#400KCMIL copper to get the 1000A minimum however I probably cannot do that due to the arrangement of the busses being parallel per phase. Would 300.3(B)(1) be violated if I do 3 sets of 4#400KCMIL by tapping the left bus with 2 sets and tapping right bus with 1 set per phase?
See photo below:

Last edited: