Here is the situation. 400 amp disconnect, 3 phase, 4 subpanels (MLO) fed off of taps from each lug of the phase. All 4 conductors under one lug. Aluminum and copper conductors. (4/0 al, 2cu, 1cu, 6cu) Subpanels within 10 ft. Questions: Can you put different and multiple conductors under one lug? Don't the subpanels need ocpd?