Even though Electric Utilities not covered by NEC, what leverage can be used to suggest the NEC be followed in a power plant and not just used for a convienent reference? My direct concern today is Temporary Power.
OSHA's 1910.269 is not the same and state safety regs are a start but are lacking.
And other than what is written in the NEC 90.2(B), why aren't power plants covered (yet we refer to it so much)?
OSHA's 1910.269 is not the same and state safety regs are a start but are lacking.
And other than what is written in the NEC 90.2(B), why aren't power plants covered (yet we refer to it so much)?