Looking for a little input. Have (6) different location where motors and conduits are being demoed and replaced. Each area/space where this equipment is about 20'x20'. The locations (6) locations are about 100' away from each other. I'm figuring I will need some power for tools/demo work. They are asking us to take temp power from an elec room about 150'. Not sure what power is available but I'll qualify. This is an industrial plant. I've attached a pic for basic layout of areas. I'm not so sure if I should bring temp power to each area or just one or two and move it as the work progresses. I fairly certain each area will be done one after another.

So my questions:

What would be the most practical implementation here.

I'm think running a home run from the electrical room to a disconnect or small 100A temp panel in the area. And using some type of SO cable for the home run. Does that make sense? I just I could drop tails out of the panel for the guys tools.

Thank you.
 

Attachments

  • Capture.jpg
    Capture.jpg
    8.8 KB · Views: 0
Status
Not open for further replies.
Top