mstrlucky74
Senior Member
- Location
- NJ
So have a situation where we are working in a new small building( 1 story building) next to a big 10 story building. Have to put a 150a temp panel in the new small buildings for construction. Thinking I can grab power from an electric closet in the existing building. Problem is we can’t survey the existing building. Questions:
1. There may be a chance there is not a 150A to pull from in the extg. bldg., correct?
2. If there is available power how would that be accomplished to tap into? Assuming too many variables/scenarios.
1. There may be a chance there is not a 150A to pull from in the extg. bldg., correct?
2. If there is available power how would that be accomplished to tap into? Assuming too many variables/scenarios.