I have to setup a ~400A temp service for construction. I can use a transformer if necessary for voltages needed.
Currently have a 13.2Kv service coming into an existing building substations/switchgear line up.
The incoming service conductors, gear lineup and all other electrical work is being demolished.
They want new 13.2Kv incoming feeders, gear etc. etc.
I would imagine they are going to want demolished equipment taken out in the beginning of the job so I don't think I can leave that active and use for my temp power until my new is up and running?
I am not sure how I can get 600V power for my temporary power needs if the 13.2Kv service is being removed.
Any thoughts. Thanks.
Currently have a 13.2Kv service coming into an existing building substations/switchgear line up.
The incoming service conductors, gear lineup and all other electrical work is being demolished.
They want new 13.2Kv incoming feeders, gear etc. etc.
I would imagine they are going to want demolished equipment taken out in the beginning of the job so I don't think I can leave that active and use for my temp power until my new is up and running?
I am not sure how I can get 600V power for my temporary power needs if the 13.2Kv service is being removed.
Any thoughts. Thanks.