There are so many "it depends" in there.... are you the Contractor or a sub?
Initially, crank-up lighting plants might do the job, and IIRC some of the LED ones can run plug-in instead of on the generator.
Or, 20' 4x4 posts a couple of feet into the ground with above-ground bracing (like a temp power pole).