Re: Temporary construction service

The branch circuits are not required to be protected, only the receptacles. All 125-volt, 15,20,and 30-ampere receptacles. Receptacles other than these must have GFCI protection or an assured EGC program.

See section 590.6 (2005 NEC)
 