superdave02
Member
- Location
- South East
- Occupation
- Electrical Consultant
Every hurricane/typhoon season I post a question about our installations. Here is where I am at this year. Our Temporary Emergency Generator installations are not covered by the NEC. They are addressed by OSHA though. Anyway, these FEMA generators, do they need a ground rod or not, that is the question. They are not a separately derived system. Thoughts?