masterinbama
Senior Member
- Location
- Huntsville Alabama
Just got a CO on a house yesterday. Due to local rules / regulations here is how the grounding system ended up. 400 amp meter main 3/0 copper to footing steel (local power company chart sizes ground not the NEC), 10' driven rod used a lay in lug tied the 1/0 to the rod and on to the meter main . County inspector called and asked where my #6 bond from the meter main to the ground rod was. Tried to explain over the phone that the 3/0 took care of that. I actually had to meet him on site and go over it with him. He pulled out this notebook full of hand drawings that all of the inspectors carry. He said since his sketch showed the # 6 I had to provide one. I could barely keep from laughing.