Nec 2014 Article 250.64(D) says multiple service disconnecting means grounding electrode connection can be following 250.64(D)(1), 250.64(D)(2) OR 250.64(D)(3).
What does the word OR mean in the code for 250.64. The question is does the Word OR mean one cannot install GECs at more then one location? So one cannot install 250.64(D)(2) option as well as 250.64(D)(3) option in same install. One has to chose either one of (D)(1), D(2), D(3) but they cannot be mix in same install?
What does the word OR mean in the code for 250.64. The question is does the Word OR mean one cannot install GECs at more then one location? So one cannot install 250.64(D)(2) option as well as 250.64(D)(3) option in same install. One has to chose either one of (D)(1), D(2), D(3) but they cannot be mix in same install?