Originally posted by LarryFine:
I like the black tape on the black wire.![]()
Neither is the NEC if above the ceiling is not Other Space Used for Environmental Air.Originally posted by websparky:
I guess MA is not concerned with plastic above the suspended ceilings? I had no idea!
Cool, that was not evident from the photo.Originally posted by websparky:
in this case, 300.22(C)(1) does apply to the NM above the ceiling because the space is also used for return air to the HVAC system
So let's see the pictures Jim.Originally posted by jimwalker:
"Jim, this looks like a pretty neat installation to me. Let's see some pics of your work. Wouldn't it be a waste of time and therfore money to do anything neater than this? That's what I have heard. "
Maybe i was bit rough on him.Will bump it up
to 2 1/2.Anyone who can call this neat needs to stay out of panels
Posted by websparky:Originally posted by jimwalker:
OK did i miss something "Don't the wires need derated since there is more than 9 conductors in a piece of PVC 74" long??" Where did the 74 inches show up in that picture ? I see less than 1 foot.
SteveThe pvc is 74" and extends above the drywall ceiling that is in the equipment room only.