Is there any objection to using a threadless rigid connector between the service entance conduit and the threaded hub on the meter box/main LC?
I'm bidding a residential (aerial) service upgrade where the conduit/mast and guying are all in great shape, but I'd need to shorten the bottom of the conduit to fit the new box. The SE conduit penetrates the roof and runs inside the wall to a large recessed external enclosure. I'd rather not have to open the wall and mess with the roof integrity, and there's insufficient clearance to thread the cut end in place.
I'm bidding a residential (aerial) service upgrade where the conduit/mast and guying are all in great shape, but I'd need to shorten the bottom of the conduit to fit the new box. The SE conduit penetrates the roof and runs inside the wall to a large recessed external enclosure. I'd rather not have to open the wall and mess with the roof integrity, and there's insufficient clearance to thread the cut end in place.