We have to install a 30 KVA 3 phase transformer
to step 240 v down to 220 for a new CNC machine.
On the secondary is it required to bond X4 to the grounding conductor at the transformer even if we are not going to use the neutral?
The supply is 240 volt three wire, secondary is 220 volt three wire.