A Alwayslearningelec Senior Member Location NJ Occupation Estimator Nov 10, 2011 #1 I am confused as to the two different areas for a transformer install. One is just unload, inspect and handle and the other is install and connect. Are these suppose to be added together. Attachments photo.JPG 30 KB · Views: 0
I am confused as to the two different areas for a transformer install. One is just unload, inspect and handle and the other is install and connect. Are these suppose to be added together.
augie47 Moderator Staff member Location Tennessee Occupation State Electrical Inspector (Retired) Nov 10, 2011 #2 HUH ????
N nakulak Senior Member Nov 10, 2011 #3 i would imagine so, since both of those operations need to be performed
A Alwayslearningelec Senior Member Location NJ Occupation Estimator Nov 10, 2011 #4 yes but the handle and the install to me is just about the same. What does it take to install a floor mounted transfomer to the floor???
yes but the handle and the install to me is just about the same. What does it take to install a floor mounted transfomer to the floor???