We completed an industrial plant and seem to be having issues getting the Switchgear Study completed. We have several cabinets which feed from a 480/240 transformer and they are over the 25 feet distance. We seem to be having issues with Section 240.21 of the NEC. We were told there is may be an exception in the 2023 code which allows the transfomer to be protected by the primary side breaker in an industrial facility. I figured this was the place to go and ask about this so here I am. Can anyone help us with the code interpetation with the 240.21 Code issues with the delta/delta transformer?