Contractor has an new (unused) 225 kva step down, dry transformer that he wants to use in place of the 150 kva specified. If the proper primary and secondary overcurrent protection, conductors, clearance , etc are installed and sized for the 150 kva, does this violate any NEC rules? Is there something in article 230 or 450 that this violates?