If you have two separate tray systems with cables being interchanged between trays (All cables are Fiber optic or controls), however both trays are bonding to the building ground ring is it required to also install bonding jumpers between each one of the tray systems where cables change paths? Current inspector is stating that at the points of transition it creates a discontinuous tray system and needs bonding jumpers added at all locations.
 