When running Instrument wire, RTD wire, and THermocouple wire to a local panel, outside in a gas plant, is it necesarry to run Tray Type Cable?
The area is Class I DIV II and may not necessarly run conduit on Skids or Equipment, simply from instruments to a local panel using racks, from there the conduit runs to the control room in conduit racks.
The area is Class I DIV II and may not necessarly run conduit on Skids or Equipment, simply from instruments to a local panel using racks, from there the conduit runs to the control room in conduit racks.