Got a job where we'll be pulling 250 4 conductor mc probably. What's the best tricks to feeding that above a drop ceiling without yanking out the grid.
Aprox 120 ft in occupied building with most of it being dead straight
Tugger with rope and pulleys
Just get 5 guys and git er done
Feed it through strategic 2 hole oversized straps then go back and finish it with correct size.