sparky220volt
Member
- Location
- Pensacola, FL, USA
I have a 10 foot long by 10 in by 10 in trough. It has 4 parallel 500 copper from the transformer totaling 16 500 coppers. There are three main lug panels on top of the trough with main breakers feeding there respective panels. There spliced in the trough from the transformer to all three panels. What I'm trying to figure out is, is the trough to small cause We've tried to fit it all in and it doesn't seem possible. I get 12,000 cubic inches for the trough. I looked up the circular mill area for all my wired then I found out the ground only counts once. But after I get my cma all multiplied and added up it doesn't come any where close to 12,000. I also saw something about only being able to fill gutters at 20%. To me this is a hard question. Just hopping someone can simplify it for me. I'm running this job and My PM is coming tomorrow and we're gonna try to figure out a way to get this done. Any input would be appreciated.