Also. This was the way the electrical riser was laid out. It's 4 parallels of 500 from the transformer taping to the feed for the 3 above panels. The 3 above panels then load back into the trough feeding straight through into the building where the sub panels are.
There are a couple of potential issues here that would concern me more than the wireway.
Are these "service" conductors from a utility transformer, or are they secondary conductors from an SDS ?