lakee911
Senior Member
- Location
- Columbus, OH
Hi all,
I recently came across a situation where a 2-phase feed (120/208 meaning L1, L2, N) is used to feel a 3-phase 208/120 panelboard.
Other than being a little goofy, is there any reason why this isn't allowed?
Should the third phase be kept empty (meaning every 3rd breaker is unused) or can it be tied over to phase 1 or phase 2?
Thx,
Jason
I recently came across a situation where a 2-phase feed (120/208 meaning L1, L2, N) is used to feel a 3-phase 208/120 panelboard.
Other than being a little goofy, is there any reason why this isn't allowed?
Should the third phase be kept empty (meaning every 3rd breaker is unused) or can it be tied over to phase 1 or phase 2?
Thx,
Jason