UF & wells

Status
Not open for further replies.
stickboy1375 said:
You drill and tap a lug in the well casing and bond the EGC going to the pump to the well casing.

Around here it is done by using the 3/4" threaded hold at the well head. They install a 3/4" threaded nipple and then attach a 4"sq. box and just ground the box with the EGC.
 
Dennis Alwon said:
Around here it is done by using the 3/4" threaded hold at the well head. They install a 3/4" threaded nipple and then attach a 4"sq. box and just ground the box with the EGC.

Never see a box at a well head around here, they just splice the wires and stuff it into the top of the well casing.
 
i dont think uf says on it" listed submersible pump cable"
i have made guys rip it out when i saw it out of the well
casing and run all the way back to panel......;)
 
donselectric said:
i dont think uf says on it" listed submersible pump cable"
i have made guys rip it out when i saw it out of the well
casing and run all the way back to panel......;)

Huh? Please explain....
 
Status
Not open for further replies.
Top