mwm1752
Senior Member
- Location
- Aspen, Colo
You need 20 feet before it will become a NEC qualifying electrode, so what good does 12 do?
If you would already have a CEE connected to the electrical system you don't need to add additional CEE's to the electrical system just because they were added to the structure, nothing prohibits bonding to them either though.
We can agree to disagree on this point -- the building has changed & an accessible electrode is added -- where in code do you find your opinion?