It was pretty sad that the CMPs could not work out their differences without resorting to battling each other using the NEC chapters they controlled. CMP4 was living in a bubble and ignoring everyone else working on the NEC. Solar can be pretty insular and I still run into contractors and engineers working in solar who have a very low level of understanding of the first four chapters of the NEC.
It appears to me that was the only way they could get the attention of CMP 4.
 