meternerd
Senior Member
- Location
- Athol, ID
- Occupation
- retired water & electric utility electrician, meter/relay tech
but poco are poco, they are special
the AHJ should not fail inspection if the pvc in ground for phys protection is red, white, or blue. by code a "fitting" needs to be on the end. in reality, a bell end or a good chamfer should suffice. by code, shove a bell on.
POCO's are "special...?" Awww, shucks....we're just always right.