Re: Unground Service distance
I think you mean underground and not ungrounded. If that's the case the service run from the transformer pad to the meter pan is usually left up to the POCO to decide where and when to install a pull box or vault. In my area, if the distance from the transformer to the meter pan is greater than 150' the POCO makes you install a concrete vault to pull the cable through.
If you're talking about the distance from the meter pan and disconnect to where ever you're installing the main lug panel, I don't believe the NEC has any ruling on that. I could be wrong so I'll default to my colleagues on that one.