Larry the cable guy
Member
- Location
- Maryland
I see that I can expect to run into this method more than I thought. I appreciate the input from everyone. This contractor did not gain my trust when I saw some of their workmanship (ie. poorly run conduits, improperly spaced mcc and switchgear, workspace around equipment, selection of materials for an industrial environment). Which left me to believe that this installation was just something that they do.