Looked at a job today that the inspector passed residential .. 400 amp meter socket on the bldg. with two disconnets attached to the meter socket and ground rod below for supplemental grd. A ground wire run to the water pipe within 5' of the entrance of the bldg. But this is what I feel is wrong and it passed. From the disconnects to the two panels inside the home the people ran 3 wires service entrance cable no ground. 2 hot and one nuetral . Does it say that a sub panel does not need to be grounded any place in the code????
They also did not seperate the grounds and Neutrals in the sub panels
They also did not seperate the grounds and Neutrals in the sub panels