A main feeder was pulled from a three phase delta- wye 13.8kV-480V transformer to a building Main distribution panel without a neutral feed. There is a The electrician said it is because the panel is only feeding three phase motors.
Would this installation be considered an ungrounded system according to NEC 250.21?
I have attached a sketch diagram of the installation.
	
		
			
		
		
	
				
			Would this installation be considered an ungrounded system according to NEC 250.21?