Hi again all,
Time for you folks to save me again:ashamed:.
Here is the situation;
On our plan sheets, mechanical drawings, it says to remove a piece of equipment ad all associated equipment.
It does NOT specify what associated equipment is nor do the plans specifically mention the conduit and wiring.
The contractor has removed the equipment and all the mechanical operators/indicators, leaving all the conduit wiring, safety switches, etc., in place arguing that nowhere does it say to remove the electrical equipment.
Our project office and I are saying that is covered by the "associated equipment" note, and needs to be removed back to at least the first used junction box.
I can't find anything in the NEC that mentions this, however I do remember, possibly incorrectly, somewhere it does or at least talks about unused openings?
Thanks for all the help!!
Rich
73 N7NEC
Time for you folks to save me again:ashamed:.
Here is the situation;
On our plan sheets, mechanical drawings, it says to remove a piece of equipment ad all associated equipment.
It does NOT specify what associated equipment is nor do the plans specifically mention the conduit and wiring.
The contractor has removed the equipment and all the mechanical operators/indicators, leaving all the conduit wiring, safety switches, etc., in place arguing that nowhere does it say to remove the electrical equipment.
Our project office and I are saying that is covered by the "associated equipment" note, and needs to be removed back to at least the first used junction box.
I can't find anything in the NEC that mentions this, however I do remember, possibly incorrectly, somewhere it does or at least talks about unused openings?
Thanks for all the help!!
Rich
73 N7NEC