jmurray32168
Member
- Location
- Conyers Georgia
- Occupation
- Lead Compliance Engineer
1. Does the NEC require all power cord or feeder loads to be landed or terminated? For example, can the neutral on a power cord be terminated with a wire nut where the cord would be wired to a display case? Or must all wires be landed on a terminal and marked for future use if not used?