An existing 100 amp load is supplied by a 3-phase 100 amp breaker. A new 100 amp load is being installed. The system can't handle the load of both the existing and the new at the same time, and there will never be a need to run them both at the same time. What do you think about using a Manual Transfer Switch to select which load will get power and be allowed to operate?