A few questions about upgrading:
We currently have 250w panels brand unknown but available, with enphaseM250 inverters at each panel and an ENVOY on the line. The max throughpower for the inverters is 250W, so if we wanted to replace all the panels with higher output ones, say 375w, we'd need to place the inverters as well? And the ENVOY?
Because the wattage is beyond their capability?
And they 'd have to be compatible with the existing control of the gateway, I suppose?
We currently have 250w panels brand unknown but available, with enphaseM250 inverters at each panel and an ENVOY on the line. The max throughpower for the inverters is 250W, so if we wanted to replace all the panels with higher output ones, say 375w, we'd need to place the inverters as well? And the ENVOY?
Because the wattage is beyond their capability?
And they 'd have to be compatible with the existing control of the gateway, I suppose?