iwire said:What about the equalpotential grounding grid?
Is that not required under the 2008?
As I understand it this is a(packaged) hot tub. Would that also need the same bonding as a in ground Pool ?
E) Methods of Bonding. All metal parts associated with the spa or hot tub shall be bonded by any of the following methods:
(1) The interconnection of threaded metal piping and fittings
(2) Metal-to-metal mounting on a common frame or base
(3) The provisions of a copper bonding jumper, insulated, covered, or bare, not smaller than 8 AWG solid.
(F) Grounding. The following equipment shall be grounded:
(1) All electric equipment located within 1.5 m (5 ft) of the inside wall of the spa or hot tub
(2) All electric equipment associated with the circulating system of the spa or hot tub
(edit) portable to read packaged.
Last edited: