If a 100A Main Service Panel with a 100A Main Breaker can only receive 20A of PV backfeed would installing a new sub-panel and backfeeding 40A still overload the Main Panel bus? Seems to me that it would since the 40A is still landing on the MSP bus, just going through a sub first.
I've been seeing this a lot but haven't seen it discussed.
Thoughts?