I have had several estimates for an installation of a manual main load center transfer panel. Pull out a 150 amp main load center panel and install a Reliance TTV1506C manual main load center Transfer Panel. The problem is a 220 .75 amp load circut, that feeds the generator Utility Control circuit. This circuit needs to come from utility power to sence power or power failure. All of the electricins that looked at it said that they can put it on the load side lugs and install 2 2amp inline fuses.
Question what is the correct way of suppling a 220v .75 amp load circut, that feeds the generator Utility Controller circuit.