Location is in Butte County California.
Installing (2) strings (circuits) on a residential roof using micro-inverters. Is there any problem (code or otherwise) with installing (2) circuit breakers directly in the service panel as the disconnect? Or must they be fed through a combiner so that the utility interconnection consists of a single switch?
Looking around the area I see a lot of these systems with their micro-inverter AC output circuits running through a combiner (just a load center) and then over to the interconnect location.
Installing (2) strings (circuits) on a residential roof using micro-inverters. Is there any problem (code or otherwise) with installing (2) circuit breakers directly in the service panel as the disconnect? Or must they be fed through a combiner so that the utility interconnection consists of a single switch?
Looking around the area I see a lot of these systems with their micro-inverter AC output circuits running through a combiner (just a load center) and then over to the interconnect location.