bradleymattlin
Member
- Location
- Airville, PA
Doing a walk in cooler box Running emt from switch to junction box. Then out of j box to first light Which is fine. Everything is bonded and equipment ground is installed. Now between the next three lights we are running emt. But the vapor proof lights are plastic. Do we need a bonding bushing to bond the pipe. Or is over thinking it???