Jody Boehs
Member
- Location
- Fairview, Oklahoma, USA
- Occupation
- Controls and Electrical Manager
OK.  Next question....
This is the drive I am wanting to use.
I am oversizing it just a bit to make double sure it will do what I want it to do.
My only concern is... can this drive achieve a 15-60 second ramp up time? (I said a 10-15 second ramp up time in an earlier post, but after more research on production side of things, we can deal with a longer ramp up time)
	
		
			
		
		
	
				
			This is the drive I am wanting to use.
I am oversizing it just a bit to make double sure it will do what I want it to do.
My only concern is... can this drive achieve a 15-60 second ramp up time? (I said a 10-15 second ramp up time in an earlier post, but after more research on production side of things, we can deal with a longer ramp up time)
 
				
 
 
		 
 
		 
 
		