Same here. If we don't do them, we get no service drop. :cool:

But that's okay; I'd rather have to provide POA's than meter bases.

Unfortunately, I'm required to provide everything. The local POCO, who advertises "Obsessively, relentlessly at your service" only want to click and crimp.

Someday, they'll require us to run the triplex to their poles.
emoticon-0183-swear.gif
 
What about the clearance beside the windows?

If that's 8inch siding the openable portion of that upper window looks to be less than 36" to me.....


We did a riser just like this the other day on my ex-sister inlaws house, we put up a new riser that was taller.....
 
Unfortunately, I'm required to provide everything. The local POCO, who advertises "Obsessively, relentlessly at your service" only want to click and crimp.

Someday, they'll require us to run the triplex to their poles.
emoticon-0183-swear.gif

I guess I don't get it. I thought all you EC's loved providing material because it's one more thing you can markup?
 