I've got a lighting post project I'm quoting for a customer in the back of their property that includes (7) 20' tall posts. The furthest one is right at about 1000' away.
I have a 5.74 amp calculated load and am going to run them on 240v single phase. Just want to make sure I did my calculations correct for quoting out wire size and conduit.
If I am correct I will have to run a #3 cu. in order to avoid going above the 3% max for a branch circuit. Can someone tell me I've done this correctly? I don't do this very much.
I have a 5.74 amp calculated load and am going to run them on 240v single phase. Just want to make sure I did my calculations correct for quoting out wire size and conduit.
If I am correct I will have to run a #3 cu. in order to avoid going above the 3% max for a branch circuit. Can someone tell me I've done this correctly? I don't do this very much.