enireh
Senior Member
- Location
- Canyon Lake,TX
a customer had her slab done for the barn and stubbed 1 1/2 pvc out. the barn is 300' from the service so we are running 4/0 copper for a 150 amp feed to the barn. I thinking about having a pvc junction box at the barn and come out of it with 2/0 copper so we can get in the 1 1/2 pvc to the panel inside. not orthodox I know