Sajid khan
Senior Member
- Location
- Pakistan
Hi All,
We have a project where we are using synchronising of 2x500kVA LV (400V) Generators on a common bus, the supply is then fed to 1250kVA step-up transformer to step up voltage(11kV) to transmit it to 350M away where the supply voltage is again step down by 1250kVA to 400V for utilisation.
My questions are,
1. What can be the implications of this system generally?
2. Will it be problematic to generators, to overcome Sudden load increase or decrease, as there are transformation of voltages at two levels(step-up & step down? What i m thinking is that the generators will experience a delay response upon load variation due to double transformation of voltages.
Valuable Suggestions are required
Thanks in advance
Sent from my iPhone using Tapatalk
We have a project where we are using synchronising of 2x500kVA LV (400V) Generators on a common bus, the supply is then fed to 1250kVA step-up transformer to step up voltage(11kV) to transmit it to 350M away where the supply voltage is again step down by 1250kVA to 400V for utilisation.
My questions are,
1. What can be the implications of this system generally?
2. Will it be problematic to generators, to overcome Sudden load increase or decrease, as there are transformation of voltages at two levels(step-up & step down? What i m thinking is that the generators will experience a delay response upon load variation due to double transformation of voltages.
Valuable Suggestions are required
Thanks in advance
Sent from my iPhone using Tapatalk