What are my legal options

Status
Not open for further replies.
I have a 240 volt 3 phase 3-wire delta system with no neutral going to a 100AMP MB Square D QO panel at a pumping station feeding two 10HP submersable pumps on VFD's. I need a neutral to get 120 volts to feed new PLC's, lights, outlets and instuments like ultra sonic levels, mag meter and floats. Is my only option to come off of panel to a transformer to a lighting panel or am I missing the big picture??
 
Status
Not open for further replies.
Top