I need to bond and ground all metal in a cinder block room that is 14' x 20'. The room has a 6" concrete slab reinforced with 5/8" and 3/8" rebar. I have an electrode connection from the rebar stubbed up for the GEC, but the question I have is should I also drive a 5/8" by 9' GEC. The purpose for this is for static discharge in a Methanol room.