I have a large condo/hotel building with a 120/208 volt 3 phase 3000 amp service. My concern on the matter is if I should count the neutral conductor [310.15 (B)(4)(c)]to derate the feeders from the MDC to the other disturbution centers.What is the red flag that should be thrown up for me to concider derating a 4-wire 3-phase feeder.
Last edited: